Client: Graniterock

Owner: Caltrain

The San Mateo Daily Journal noted that this project was completed ahead of schedule.  CMC removed and installed thermoplastic pavement markings, installed roadside signs, and designed and installed temporary traffic controls for all trades.

From Caltrain’s website:

Caltrain began work to improve the safety at 15 grade crossings (places where streets cross the tracks) along the corridor from San Francisco to San Jose in June 2018. Improvements included more clearly-marked pedestrian crossings with new paint striping and lettering; tactile pavement markers; and guardrails. Medians were also installed or improved at eight locations.

These safety improvements occurred at:

City Location Crossing Median
San Francisco 16th St. X  
Burlingame Broadway X  
Burlingame/SM Peninsula X  
San Mateo 4th X Improve
Menlo Park Ravenswood X  
Palo Alto Alma St. X Improve
Palo Alto Churchill   New
Palo Alto East Meadow   New
Palo Alto Charleston X New
Mt. View Rengstorff X  
Mt. View Castro X  
Sunnyvale Mary Ave X  
Sunnyvale Sunnyvale   New
San Jose Auzerais   New
San Jose W. Virginia   New