Client: Redwood Rentals / Caltrans

CMC Traffic Control performed the traffic control on this project, including setup of k-rail and crash cushions and flagging a one-way reversible lane on Caltrans' Highway 1 north of Santa Cruz.

Flagging for a one-way reversible lane

Client: Avalon Bay Communities

CMC Traffic Control provided traffic control design, lane closures, sidewalk closures, equipment sales, and permit assistance at Avalon Bay's new development at 55 9th St, San Francisco.

In these photos we are closing traffic lanes on 9th St while Sheedy Crane erects their crane.

Client: Steve P. Rados, Inc. / San Francisco Public Utilities Commission

Client: The Dutra Group / Port of San Francisco

CMC Traffic Control designed and implemented the traffic control on this project, including several shut-downs of the Embarcadero, a major roadway along the San Francisco water front with heavy mass transit, pedestrian, bicycle, and vehicular traffic.  In addition, we performed saw cutting and core drilling services.

Embarcadero Lane Closure

Client: Mitchell Engineering / San Francisco Municipal Transportation Agency

 

 

 

CMC Traffic Control designed and Implemented all traffic routing, including detours and work area shut downs for the 3rd Street Light Rail Project. This extension of MUNI's light rail service spans the distance between Jerrold Avenue and Donner Avenue in the Bayview commercial district and is one of nine segments along the 3rd Street corridor as part of MUNI's plan to transform 3rd Street into one of the City's 'Great Streets'. In conjunction with the City's revitalization efforts and through a series of design elements that will include widened sidewalks with special artist-designed paving patterns, distinct neighborhood trees, pedestrian lighting, and unique colored rail trackway paving, 3rd Street will also serve as a 'Main Street' for the various and distinct communities along the corridor. Construction of the new light rail includes construction of underground utilities for electrical, sewer, water and high pressure water systems; track work, transit platforms, sub-sidewalk basement modifications, roadway pavement, sidewalk reconstruction, landscaping, street lighting, traffic signals, and overhead catenary system.

Client: City of San Mateo Department of Public Works

Completed spot sewer repairs in various locations on this Caltransright-of-way in the City of San Mateo.