Clients: Dragados/Flatiron/Sukut JV

The San Francisco Public Utilities Commission together with Dragados USA, Flatiron and Sukut JV is currently replacing the Calaveras Dam in Sunol, California. The project will replace the original dam, built in 1925, with a new 210-foot-high earth and rock fill dam designed to accommodate earthquakes on the Calaveras Fault. CMC designed the traffic controls for various sign-installation tasks. More details are available on the Calaveras Dam Replacement website.

"Bicyclists - Share The Road" signs are being installed.

Installing speed limit signs using gas-powered auger.