Client: Dixon Marine / City of Alameda

This project involves the dredging and disposing of bottom sediments from the Alameda South Shore Lagoons and place it at Alameda Site IR 1. The material to be dredged is believed to consist of a layer of soft sediment, with sand and clay. There may also be storm related debris, shell, clay, sand, silt, mud, trash and combinations thereof. CMC designed and implemented the traffic control plans that allowed Dixon Marine to access the lagoons. The goal here is to cause the least possible obstruction and inconvenience to public traffic during dredging operations. More details are available on the Alameda South Shore Lagoons project website.

Lane Shit on Broadway in AlamedaLane Shift on Broadway in Alameda